We’re thrilled to share that Phase 1 of Beach Houses is taking shape! Below are updates on individual units:
Unit 4122/23
The roof beams have been cast and the team is presently installing the roof.
Unit 4124/25
Room beam steel is being installed in preparation for the concrete. The pool base has also been cast and plumbers and electricians are running conduits.
Unit 4126/27
Ground floor slabs have been poured and the walls are advancing.
Unit 4128/29
Foundations are complete and back-filling is ongoing in preparation for the sub-structure services and ground floor slab. The pool is also laid out and block work continues.
Unit 4130/31
Roof structure beams are being prepared for concrete.
Unit 4132/33
Roof slabs are placed and the team is in the process of making this unit water-tight. Internal rendering to walls has also started.
Unit 4134/35
Tiling is ongoing and the windows have been installed. The team is presently working on installing the external doors.
Unit 4138/39
Floor and wall tiling is almost complete and the team is installing the external doors presently.
General Exterior Works:
Works to the central access road has started and the team is also excavating for the base of the retaining wall.